NV Ch. 2 — Passage Appraisal

1. Introduction — what appraisal is and why it comes first

Before any voyage is embarked upon — indeed before any project is undertaken — those who control the venture need to understand the risks involved. The appraisal stage of passage planning is the stage that examines those risks. Where alternatives exist, the risks are weighed and a compromise is reached, balancing the level of risk against commercial expediency.

Source: SWIFT, A. J.; BAILEY, T. J. Bridge Team Management: a practical guide. 2nd ed. London: The Nautical Institute, 2004. Chapter 2 — Passage Appraisal (pp. 9-15).

Edital: Anexo 2-B, Área III, item 1 (Swift & Bailey) → Chapter 2 — Passage Appraisal · Anexo 2-A, Área III, item 10 (Planejamento de derrota / Passage planning — fase de avaliação), conexão item 12 (prático a bordo).

Appraisal may be considered the most important part of passage planning, because it is here that all pertinent information is gathered and the firm foundation for the plan is built. The urge to start planning as soon as possible should be resisted: time spent on appraisal pays dividends later. Where the four building blocks of the book are Appraisal → Planning → Organisation → Monitoring, this chapter is the first one — the preparation step that everything else rests on.

The appraisal could be considered to be the most important part of passage planning as it is at this stage that all pertinent information is gathered and the firm foundation for the plan is built. — Swift & Bailey, Chapter 2 (Introduction)

2. Sources of information — the 23 inputs to appraisal

2.1 The checklist of 23 sources

The master's decision on the overall conduct of the passage is based on an appraisal of the available information. That information is drawn from sources "including but not limited to" the 23 listed below. Not every source is needed for every passage — the list is a quick check on what is necessary for most, and experience tells the planner just what a given passage requires. The book quotes only British and American catalogue numbers; similar publications exist from other national authorities.

The 23 sources of information for appraisal (§ Sources of information).
#SourceWhat it gives / key reference
1Chart CataloguePublished annually by the Hydrographer of the Navy (British) as NP 131, and by the Defence Mapping Agency (US) as CATP2V01U. (HO publication numbers may change and must be confirmed.)
2Navigational ChartsMany ships carry British (BA) charts, but in some areas locally published charts are advisable. US and Canadian regulations require vessels in their waters to carry and use the appropriate national charts. Care must be taken to establish the chart datum used.
3Ocean Passages for the WorldHydrographer of the Navy as NP 136; planning of ocean passages, oceanography and currents.
4Routeing Charts / Pilot ChartsBA Charts Nos. 5124-8; DMA (USA) Atlases NVPUB105-9, PILOT16, PILOT55. Monthly ocean routeing, currents, winds, ice limits, meteorology.
5Sailing Directions / Pilot BooksBA Pilot Books in 74 volumes (worldwide); DMA series SDPUB 121-200 ("Planning Guides" ≈ Ocean Passages; "Enroute" ≈ Pilot Books).
6List of Lights and Fog SignalsBA in eleven volumes NP74-84 (also CD-ROM). US Coast Guard seven volumes COMDTM165021-7; DMA LLPUB110-6 for the rest of the world.
7Tide TablesBA annually in three volumes (worldwide); BA computer programme SHM-159A; US National Ocean Service NOSPBTT worldwide tables.
8Tidal Stream AtlasesBA atlases for NW Europe and Hong Kong; US NOS Tidal Current Tables / Charts for North America, Pacific coast and Asia.
9Notices to MarinersWeekly editions by British and US authorities, to keep charts and publications up to date; also CD-ROM for electronic charts.
10Ship's RouteingPublished by IMO: all routeing, traffic separation schemes, deep-water routes and areas to be avoided adopted by IMO.
11Radio Signal Information(British) Admiralty Lists of Radio Signals — twelve volumes, e.g. NP281 (Coast Radio Stations), NP282 (Radio Aids / SatNav / Time / EPFS), NP283 (Maritime Safety Information), NP284 (Met. stations), NP285 (GMDSS). US DMA RAPUB117.
12Climatic InformationFrom Pilot Books, Pilot Charts, Ocean Passages; UK Met. Office Meteorology for Mariners. Must always be updated by the latest weather information.
13Load Line ChartLoad Line Rules are mandatory; zones shown in Ocean Passages for the World or BA Chart D6083.
14Distance TablesOcean and coastal distance tables — BA NP350, US DMA NVPUB151, NOSSPBPORTSDIST.
15Electronic Navigation Systems HandbooksMust be available; necessary should the prime electronic source fail. Depend on the systems fitted; should have been supplied with the equipment.
16Radio and Local WarningsLatest changes to navaids from radio (incl. NAVTEX) and local warnings; local info often from the Harbour Authority. See ALRS Vol. 3.
17Draught of ShipAnticipated draught and trim at each stage, to calculate under-keel clearance in shallow water; extreme height above the waterline (air draught) for low overhead clearances.
18Navigational TermsAll watchkeepers and shore personnel need a clear understanding of navigational terms; ISO 19018 covers these requirements.
19Owner's and other unpublished sourcesSupplementary info from owners, charterers, reports from other vessels, agents, Port Authority handbooks and regulations.
20Personal ExperienceThe personal experience of crew members who have visited the anticipated ports and areas can be valuable.
21The Mariner's HandbookHydrographer of the Navy (British); general information of interest to the mariner.
22Guide to Port EntryLloyd's of London Press / Portguides; often gives information not available elsewhere.
23Nautical AlmanacFor times of sunset/sunrise; aids position fixing when electronic systems fail.
Watch out: the list is a checklist, not a mandatory minimum — not all 23 sources are necessary for every passage. But each one omitted is a deliberate decision, not an oversight: the planner uses experience to judge which are required, and the catalogue numbers above are British/American only.

3. Overall appraisal — ocean passages

3.1 Distance versus the other factors

Having collected all relevant information, the master — in consultation with his officers — makes an overall appraisal of the passage. For a trans-ocean route the first consideration is the distance between ports and the availability of bunkers and stores. A great circle is the shortest distance, but other factors weigh against pure distance.

Factors weighed in the ocean appraisal (§ Ocean).
FactorHow it is handled
Meteorological conditionsA weather routeing service may be advantageous: a route longer in distance can be shorter in time and cause the ship less damage.
Ocean currentsFavourable currents give a better overall speed and can offset the disadvantage of a longer route.
Weather systemsA ship in the Far East in summer needs plenty of sea room against a tropical revolving storm; a high-latitude passage may require ice to be considered.
Load Line RulesWhatever the preferred track, the Load Line Rules must always be obeyed.
Areas to avoidFor political or safety reasons a ship may need to keep clear of specified areas.
Owner / charterer conditionsSpecified UKC, distances off grounding areas or land, preferred/avoided straits, latitude limits, or a required speed. The master has final authority and should state any such conditions before planning starts.

4. Overall appraisal — coastal passages and the berth-to-berth principle

For the coastal stage, the first consideration at appraisal is the distance that tracks should be laid off coastlines and dangers. Where IMO traffic separation and routeing schemes operate, such routeing has to be followed. Some states impose minimum distances-off for all or specified vessels; shipping companies or charterers may add their own minimum distances off dangers or land. In archipelagos, the appraisal must determine which straits and passages to use and whether pilotage is required — sometimes it is preferable to divert around the archipelago entirely.

Having appraised the intended voyage — short coastal hop or major trans-ocean passage — the master determines his strategy and delegates the actual planning to one of his officers: usually the second mate, sometimes a designated navigating officer, occasionally the master himself. Whoever plans, it must be to the master's requirements, because the master carries the final responsibility for the plan.

4.1 Berth to berth — not pilot station to pilot station

The plan must include all eventualities and contingencies. Passage plans are often made from pilot station to pilot station, but the rule is to plan from berth to berth — even when a pilot is expected to conduct the vessel at certain stages — because the pilot's presence does not relieve the watch officer of his duties:

"Despite the duties and obligations of a pilot, his presence on board does not relieve the officer in charge of the watch from his duties and obligations for the safety of the ship." — IMO Resolution A.285(VIII), Annex A (v)
Berth to berth: precisely because the pilot does not take over the watch officer's legal responsibility for the ship's safety, the passage must be planned all the way from one berth to the other, pilotage waters included — never just from pilot station to pilot station.

5. Navigational hazard notes — verifying corrections

The bridge team must be able to verify that corrections are up to date and that all relevant navigational warnings have been noted. A chart that contains corrections does not necessarily indicate whether they are the most up-to-date available — the presence of corrections is not proof of currency. A notebook entry enables this detail to be verified (see Annex II).

Common trap: assuming a corrected chart is a current chart. Corrections on the chart only show what has been applied, not whether newer ones exist. The proof of currency is the team's own record of corrections and warnings checked — kept in a notebook, not read off the chart face.

6. Appraisal in one view

Appraisal is the information-gathering foundation of every passage plan and the most important of its parts. The master, with his officers, weighs risk against commercial expediency, then delegates the planning while keeping final responsibility. The chapter reduces to:

Appraisal — summary of the chapter.
StepEssence
GatherConsult the relevant sources from the list of 23 ("including but not limited to"); only those the passage actually needs.
Appraise oceanDistance, bunkers/stores, great circle vs. weather routeing, currents, weather systems, ice; always obey Load Line; respect owner/charterer and areas-to-avoid conditions.
Appraise coastalDistance off coast/dangers, mandatory IMO TSS/routeing, state and company minimum distances, archipelago strait/pilotage choices.
DelegateMaster sets strategy and delegates planning (usually the second mate); master keeps final responsibility.
Plan berth to berthInclude all contingencies; plan berth to berth (IMO Res. A.285(VIII)), not pilot station to pilot station.
Verify currencyConfirm corrections and warnings are up to date via a notebook entry — a corrected chart is not necessarily a current one.