NV Ch. 4 — Executing the Plan

1. Introduction — from a plan to its execution

The plan has now been made, discussed and approved (Chapters 2 and 3). Chapter 4 covers the next stage: working out how the plan will actually be carried out. Where appraisal gathered the information and planning drew the marks on the chart, execution is about the methods and resources used to put that plan into effect — and about getting the ship and her people ready for sea.

Source: SWIFT, A. J.; BAILEY, T. J. Bridge Team Management: a practical guide. 2nd ed. London: The Nautical Institute, 2004. Chapter 4 — Executing the Passage/Voyage Plan (pp. 38-41).

Edital: Anexo 2-B, Área III, item 1 (Swift & Bailey) → Chapter 4 — Executing the passage/voyage plan · Anexo 2-A, Área III, item 11 (Manobra de embarcações em águas restritas — "Executing the Plan"; núcleo do tópico).

The chapter has two big movements. First, tactics — the timing and resourcing decisions that turn the plan into a workable operation (when to be where; who and what is needed). Second, preparation — readying the people (briefing, fatigue) and the workplace (bridge preparation) so the passage can begin safely. The whole emphasis is management: planning the resource, briefing the team, and preparing the workplace before the task starts.

2. Tactics — methods and timing of the plan

Tactics are the methods used to carry out the plan, including the best use of available resources. Final details are confirmed only when the actual timing of the passage can be established. Once that timing is known, the tactics to accomplish the plan are agreed.

Timing factors agreed as tactics (§ Tactics).
FactorWhat it fixes
ETAs for tideExpected times of arrival at critical points to take advantage of favourable tidal streams.
ETA for daylightETAs at critical points where a daylight passage is preferable, or where it is better to have the sun behind the ship.
Traffic conditionsTraffic conditions at focal points (where routes converge).
Destination ETAETA at destination — especially where early arrival gives no advantage, or where a pilot boarding time has been confirmed.
Why the timing matters: the same chart marks (no-go areas, tidal windows) only become safe at the right state of tide. Tactics fix when the ship reaches each critical point so the planned windows are actually used.

3. Tidal streams and currents in the execution

Tidal stream information, taken from the chart or from tidal stream atlases, can be built into the planned passage once the time of transit of the relevant area is known. Ideally, the courses to steer should be calculated before making the transit.

A key practical point: in fact, strict adherence to the planned track will automatically compensate for tidal streams — keeping the ship exactly on the charted track already cancels the set and drift. Current information can also be obtained and shown on the chart.

4. Plan modification and additional personnel

4.1 Plan modification

It must always be borne in mind that safe execution may only be achieved by modifying the plan. Two triggers are named: navigational equipment becoming unreliable or inaccurate, and time changes that have to be made, e.g. a delayed departure.

4.2 Additional personnel

To execute the plan safely it may be necessary to manage the risks by using additional deck or engine personnel. This requires an awareness of the positions at which it will be necessary to:

Positions calling for additional personnel (§ Additional Personnel).
#Action required at that position
1Call the master to the bridge for routine situations — approaching the coast, passing through constrained waters, approaching the pilot station, etc.
2Change from unattended to manned machinery space.
3Call an extra certificated officer to the bridge.
4Make personnel, in addition to the watchkeepers, available for bridge duties — manning the wheel, keeping lookout, etc.
5Make personnel, in addition to the watchkeepers, available for deck duties — preparing pilot ladders, clearing and standing by anchors, preparing berthing equipment, engaging tugs, etc.

5. Briefing the team

Before commencing the voyage it is necessary to brief all concerned. Briefing ensures every person is aware of their involvement in the planned passage and gives them the chance to query or comment on any part of the plan they do not fully understand.

Briefing may take place over a considerable period of time. As the actual start of the voyage approaches, certain specific personnel are briefed so that work schedules and requirements can be planned. In particular, any variation from the routine running of the ship — e.g. doubling of watches, anchor party requirements — must be specifically advised to the people involved, either by the master or the navigator.

Briefing is continuous, not a one-off: it requires frequent updating, and different stages have to be re-briefed as the voyage progresses. Briefing also makes each individual aware of their own part in the overall plan and contributes to their work satisfaction.

6. Fatigue management

Before the passage commences — and in certain cases during the passage — the master may need to ensure that rested and unfatigued personnel are available. This applies at demanding times such as leaving port, entering very heavy traffic areas, bad weather, or high-risk situations such as transiting a narrow strait.

Within the limits of the total number of people available, this is achieved by ensuring that watchkeepers of all descriptions are relieved of their duties well in advance of being required on watch, so that they may rest. It may require changes to routine watchkeeping periods — extending certain watches or even curtailing them. This is at the master's discretion, and he should not hesitate to make such changes.

7. Passage preparation — readying the workplace

One of the basic principles of management is ensuring that the workplace is prepared and readied for the ensuing task. Preparing the bridge for sea is normally the task of a junior officer.

Watch out — the checklist trap: such routine tasks are best done with a checklist, but care must be taken that this does not simply mean items are ticked off without the actual task being done.

8. Bridge preparation for sea

At the time designated by the master, the responsible officer prepares the bridge. The list below is only a general guide — each ship will have its own specific checks to add, and a modified version should also be carried out when approaching port or any area where other than routine watchkeeping may occur.

First, the passage plan and supporting information must be available and to hand. The navigating officer who prepared the passage plan will likely have made these ready; nevertheless, their readiness should still be confirmed.

Bridge preparation checklist (§ Bridge Preparation) — general guide.
#Check
1Charts in order, in the chart drawer; the in-use chart available on the chart table. Bad practice to have more than one chart on the table at a time — information read from one and transferred to the other may not be correct.
2Chart-table equipment in order and to hand: pens, pencils, parallel rules, compasses, dividers, note pads, scrap pads.
3Ancillary watchkeeping equipment in order: binoculars, azimuth rings, Aldis lamp.
4Monitoring and recording equipment operational: course recorder, engine movement recorder; recording paper replaced if necessary.
5Master gyro fully operational and correct, repeaters aligned; the magnetic compass checked.
6Instrument illumination lamps operational and light levels adjusted; availability and whereabouts of spares checked.
7Navigation and signal lights checked.
8Electronic navigational equipment that was shut down switched on; operating mode and position confirmed.
9Echo sounders and logs switched on and readouts confirmed; associated recording equipment confirmed.
10After ensuring the scanners are clear, radars switched on and tuned; appropriate ranges and modes set.
11Control equipment switched on and tested: telegraphs, combinators, thrusters and steering gear as appropriate.
12Communications equipment switched on and tested — internal (telephones, portable radios) and external (VHF and MF radios, NAVTEX, INMARSAT and GMDSS as appropriate).
13The whistle tested.
14Clear-view screens and wipers operational; all windows clean.
15All clocks and recording equipment synchronised.
16Workplace in correct order: lighting as it should be, doors and windows open and close easily, temperature controls set, movable objects in their correct place.
17The ship's data switched on and correctly entered into the AIS.
18After ensuring there is no relevant new information on the Telex, Fax or Navtex, advise the master that the bridge is ready for sea.

9. Executing the plan in one view

Chapter 4 is the bridge between a finished plan and a passage under way. It has two halves — tactics (timing and resourcing) and preparation (people and workplace):

Synthesis — executing the passage/voyage plan.
ThemeKey point
Tactics = method + resourcesDecided once the actual timing of the passage is known.
Timing factorsETAs for tide, daylight, traffic at focal points, and destination (incl. confirmed pilot boarding time).
Tidal streamsBuilt in once transit time is known; holding the planned track auto-compensates for stream.
Plan modificationForced by unreliable equipment or time changes (e.g. delayed departure).
Additional personnelAwareness of positions to call the master, man the machinery space, call an extra officer, or staff bridge / deck duties.
BriefingContinuous and updated; any variation from routine specifically advised by master or navigator.
FatigueRelieve watchkeepers well in advance; at the master's discretion to extend or curtail watches.
Bridge preparation18-point general guide; checklist must reflect tasks actually done; finish by advising the master the bridge is ready for sea.